List shared schedules with no report linked
2000, 2005 (N), 2005 (I), 2008 (N), 2008 (I),2008r2(N), 2008r2(I), 2012(N), 2012(I), Azure
(N)=Native
(I)=Integrated
GetScheduledNoRpt [schedule name]
the schedule name can be wildcard
[schedule name] Name of the schedule
•none
DelSchedule - Delete schedule
GetScheduleNoRpt - Get schedules linked to no reports.
GetScheduleRpt - Get shared schedules linked to a report.
GetSchedules - List the shared schedules
PauseSchedule - Pause a shared schedule
ResumeSchedule - Resume a shared schedule